Power Up

Design a real data center floor โ€” the invisible infrastructure behind every app, video, and AI you use daily.

Did you know? Every time you stream a video, send a message, or ask an AI a question, your request travels to a data center โ€” a building filled with thousands of servers, cooled 24/7, powered by redundant generators. A single hour of downtime at a major DC can cost $300,000+. Your job: design one that never goes down.
๐Ÿข
Your Mission
Build a Tier III Colocation Data Center
99.982% uptime SLA ยท N+1 redundancy ยท Concurrent maintainability
๐Ÿ“– Tier III = only 1.6 hours downtime per year
๐Ÿ“š You'll Learn
  • Why infrastructure placement determines survival
  • How cascade failures propagate
  • Why 6 professional roles see designs differently
  • Recognize cost-tunneling bias
๐Ÿ† How to Win
  • โšกโ„๏ธ Infrastructure first โ€” before racks
  • ๐Ÿ”‹๐Ÿงฏ Build for failure โ€” UPS + fire
  • ๐Ÿ“Š Balance 8 dimensions โ€” no single-axis
  • ๐Ÿ‘ฅ Satisfy 6 stakeholders
Round 1 โ€” Blind: Drag tiles, watch demands, survive waves. Each role scores your build.
Round 2 โ€” Guided: Mentor walks you through the optimal Fortress pattern step by step.
$80 budget ยท 6 minutes. The score gap = the learning.
W1 Normal: Tests โšก+โ„๏ธ coverage. Dead racks = wasted money.
W2 Heat: Cooling radius halves. Edge racks overheat.
W3 Outage+Fire: Generators off. Only UPS works. Fire spreads.
FIRST
๐ŸŽฏ
Blind Challenge
Your instincts + role demands.
SECOND
๐Ÿง 
Guided Mode
Mentor + ghost + live dashboard.
NEXUS-DC
Time
6:00
Budget
$80
Racks
0
1๏ธโƒฃSelect a tile from the left palette, then click a grid cell to place it. Hover tiles for details.
2๏ธโƒฃInfrastructure first! Place โšก Generators + โ„๏ธ Cooling before ๐Ÿ–ฅ๏ธ Racks. Racks need BOTH to function.
3๏ธโƒฃProtect for failure. ๐Ÿ”‹ UPS saves racks in blackout. ๐Ÿงฏ Fire blocks fire spread. Skipping = Wave 3 disaster.
4๏ธโƒฃCenter-place infrastructure โ€” a center generator covers 25 cells vs only 9 on a corner. Position matters!
5๏ธโƒฃWatch the 6 stakeholders below โ€” their satisfaction after each wave affects your final score. Read their demands.
๐ŸŽฏWhen ready, hit โ–ถ Simulate to test your design against 3 escalating disaster waves. Good luck!
Grid colors: โšก Power only โ„๏ธ Cooling only โœ… Both โ€” place racks here! Hover preview $80 budget ยท 6 min ยท 10ร—7 grid
๐Ÿ’กTips & Demands
SIMULATION
Wave
โ€”
Revenue
$0
Uptime
100%
โšกWave 1: Tests โšก+โ„๏ธ coverage. Uncovered racks = instant death.
๐Ÿ”ฅWave 2: Heat wave. Cooling range halves. Edge racks overheat.
โšซWave 3: Grid fails. Only ๐Ÿ”‹ UPS works. Fire spreads without ๐Ÿงฏ.
Progress:
๐Ÿ“กSimulation Briefing
Simulation Complete
0
Composite Score
๐Ÿ‘ฅ Stakeholder Satisfaction
๐Ÿ” Wave Analysis
๐Ÿ“Š How Your Score Was Calculated
๐Ÿ› ๏ธ How To Improve
๐Ÿ“š What You'll Learn in Training
๐Ÿ“‹ Attempt Board
Click to expand